logo2MBS ENGINEERING LIMITED

• 10MW Tiga and 25MW Challawa Hydro Electricity Project.
• Katsina-Kurfi-Dutsinma-Malumfashi 132kV DC transmission line.
• Construction of 2x30MVA, 132/33kV substation at Kurfi and 2x132kV line bay extension.
• Construction of 2x60MVA, 132/33kV substation at Malumfashi with 4x132kV line bay extension.
• Construction of 2x60MVA, 132/33kV substation at Dutsinma.
• Construction of 2x60MVA, 132/33kV substation at Kankara with 2x132kV line bay extension at Dutsinma.
• Extension of 33KV line, installation of 2.5 MVA, 33/11KV Transformer, Outdoor Voltage/Current transformers, 11 KV panels and 1.6 MVA 11/.415KV Transformer at Zaria Pharmaceutical Company Limited.
• Electrification of Kulluwa, Dandagana, Dumaje, Yanoko, Tudun- Bayero, Akalawa, Jili, Yansabo, Kera and Unguwar Kudu towns in Kano State.
• Supply and installation of 1,500KVA, 415V/11,000V Transformer at Bayero University, new site.
• Supervision of the Rural Electrification projects in Kano and Jigawa States sponsored by the Federal Government under MDG and NREP.
• Extension of 33KV line and inastallation of 2.5MVA, 33/11KV transformer at Coca-cola plant at Challawa, Kano and Kakuri, Kaduna.
• External Electricity supply and distribution at Yankari Resort safari comprising extention of 33KV line, installation of 5MVA transformer, HT panel, underground HT network and distribution substations
• External Electricity supply and distribution at the School of Health Technology, Ningi.